Class 100 Ce Iso GMP Prefab Clean Rooms Cleanroom Supplies Rock Wool Sandwich Panel Hepa Filter
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 50 square meters |
| Price: | $500.00/square meters 50-499 square meters |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
gmp cleanroom
,class 100 cleanroom
,modular cleanroom construction
Class 100 Ce Iso GMP Prefab Clean Rooms Cleanroom Supplies Rock Wool Sandwich Panel Hepa Filter
Product Overview
According to ISO 14644-1, a cleanroom is "a room in which the concentration of airborne particles is controlled, and which is constructed and used in a manner to minimize the introduction, generation, and retention of particles inside the room, and in which other relevant parameters (e.g., temperature, humidity, pressure) are controlled as necessary."
Cleanroom Description
| Application | Pharmaceutical | Lab | Electronics |
| Cleanliness | Class 100–100000 or applicable ISO/GMP classification | ISO 5–8 or project-specific classification | ISO 5–8 or project-specific classification |
| Scope |
Structure part; Partition and ceiling panel; door and window,epoxy. |
HVAC part; AHU and chiller; Ducting and piping. |
Electrical part; Lamp,switch and socket; Distribution cabinet. |
| Service | Design and production | Construction and test | Validation and training |
| Wall/ceiling panel | Machine-made or Hand-made sandwich board |
| Clean room equipment | Air shower,FFU,Pass box,Laminar flow cabinet,hepa box |
| Cleanliness | Class 100-100000 |
| Purification system | HVAC, or AC conditioner+FFU |
| Floor | PVC anti-static floor or epoxy-based coating |
| Other addessores | stalinite window,LED panel light,Door,Hand wash sink,storage/shoe cabinet etc |
| Service | Design,manufacturing,construction |
Features at a Glance
Tier 1: Environmental Parameter Control
Function: Establish and maintain baseline physical constants
-
-
Air Purity Management: HEPA/ULPA filtration with real-time particulate monitoring
-
Thermodynamic Stability: Precision HVAC systems maintaining ±0.5°C temperature and ±5% RH humidity control
-
Pressure Differential Enforcement: Automated pressure cascades (15-30 Pa gradients between zones)
-
Tier 2: Contaminant Vector Management
Function: Intercept contamination at all transmission pathways
-
-
Aerodynamic Contamination Control: Unidirectional airflow at 0.45 m/s ±20% (ISO Class 5)
-
Surface-Borne Contaminant Mitigation: Non-shedding materials with cleanroom-grade surface finishes
-
Procedural Contamination Prevention: Gowning protocols with particle shedding limits (<10,000 particles/min for full suit)
-
Tier 3: Operational Process Control
Function: Standardize all interactions with the controlled environment
-
-
Material Flow Engineering: Three-stage airlock systems with interlocked doors
-
Personnel Contamination Control: Class-specific garment systems with validated donning procedures
-
Process Isolation: Modular cleanroom designs allowing separation of incompatible operations
-
Tier 4: Performance Verification Systems
-
-
Continuous Monitoring: Networked particle counters with 0.3μm and 0.5μm channels
-
Validation Protocols: ISO 14644-3 compliant testing (airflow uniformity, recovery testing)
-
Data Integrity Management: 21 CFR Part 11 compliant data logging and audit trails
-
Project
Project Execution Highlights
Cleanroom Construction Progress and On-Site Management
This project was executed by the SHP engineering team following a structured cleanroom construction process, including partition installation, ceiling grid assembly, HVAC ductwork integration, lighting installation, and final commissioning preparation.
Throughout the project, regular coordination meetings were conducted with the client and subcontractors to review progress, resolve technical issues, and ensure compliance with project specifications and cleanliness requirements.
The photos below show key stages of the cleanroom construction process and demonstrate SHP's capability in managing large-scale turnkey cleanroom projects.
Ceiling Grid Installation
The suspended ceiling support system was installed according to the cleanroom design layout. The ceiling grid provides structural support for cleanroom panels, FFUs, HEPA filters, lighting fixtures, and utility systems.
Scope:
-
Modular ceiling suspension system
-
Structural alignment and leveling
-
Preparation for FFU and HEPA filter installation
-
Utility routing coordination
HVAC Ductwork Installation
The HVAC air distribution system was installed to ensure controlled airflow, temperature stability, and pressure differentials required for cleanroom operation.
Scope:
-
Supply and return air duct installation
-
Airflow balancing preparation
-
Integration with cleanroom ceiling system
-
Compliance with cleanroom ventilation requirements
Client Coordination & Progress Review Meeting
Regular project meetings were conducted with the client, consultants, and engineering teams to monitor project milestones, discuss technical requirements, and coordinate installation activities.
Meeting Objectives:
-
Construction progress review
-
Technical issue resolution
-
Installation schedule coordination
-
Quality and safety management
-
Preparation for commissioning and validation
Project Value Delivered
-
Turnkey cleanroom engineering solution
-
On-site project management support
-
HVAC and cleanroom system integration
-
International project execution experience
-
Compliance with ISO 14644 cleanroom standards
Cleanroom Ceiling Grid Installation
Project Coordination Meeting With Client Team
HVAC Air Distribution System Installation
AVB Testing Report
Third-Party Performance Testing & Validation
To verify cleanroom performance and environmental control effectiveness, independent testing and validation were conducted after project completion.
Validation Services
- Design Qualification (DQ)
- Installation Qualification (IQ)
- Operational Qualification (OQ)
- Performance Qualification (PQ)
Testing Items
- Airborne Particle Count Test
- Airflow Velocity Test
- Differential Pressure Test
- Temperature Test
- Humidity Test
- Illumination Test
- Noise Test
Third-Party Verification
The cleanroom system was tested and documented by an independent testing organization to verify compliance with project specifications and applicable cleanroom standards.
![]()
Certifications
SHP operates under a certified quality management system and manufactures cleanroom equipment in accordance with international standards for quality, safety and performance. Our engineering and manufacturing processes are continuously audited to ensure compliance with global cleanroom and HVAC project requirements.
Quality Management System
SHP is certified to ISO 9001:2015 Quality Management System standards, covering the design, manufacturing and installation of cleanroom systems, sandwich panels and air purification equipment.
Certificate: ISO 9001:2015 Quality Management System Certification
![]()
CE Certification for Cleanroom Equipment
To support international projects and regulatory compliance, major cleanroom equipment supplied by SHP has been assessed for conformity with applicable European directives related to electrical safety and electromagnetic compatibility.
CE Certified Equipment Includes:
Air Shower Room
Fan Filter Unit (FFU)
Pass Box
CE Certification for Air Shower Room
![]()
CE Certification for Fan Filter Unit (FFU)