99.995% HVAC Sandwich Panel Modular Clean Room 1000 Dust Free For Pharmaceutical Electronics
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 50 square meters |
| Price: | $500.00/square meters 50-499 square meters |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
HVAC clean room 1000
,Sandwich Panel clean room 1000
,Modular 1k clean room Dust Free
99.995% HVAC Sandwich Panel Modular Clean Room 1000 Dust Free For Pharmaceutical Electronics
Product Overview
SHP provides Class 100–100,000 modular cleanroom solutions for pharmaceutical, electronics, laboratory and medical manufacturing facilities.
With more than 20 years of cleanroom engineering experience and over 2,100 completed projects in 40+ countries, SHP delivers integrated cleanroom construction services including HVAC installation, cleanroom panel systems, HEPA filtration, commissioning and validation.
All cleanroom systems are designed according to ISO 14644 and GMP requirements to ensure stable environmental control, contamination prevention and long-term operational reliability.
Cleanroom Description
| Application | Pharmaceutical | Lab | Electronics |
| Cleanliness | Class 100–100000 or applicable ISO/GMP classification | ISO 5–8 or project-specific classification | ISO 5–8 or project-specific classification |
| Scope |
Structure part; Partition and ceiling panel; door and window,epoxy. |
HVAC part; AHU and chiller; Ducting and piping. |
Electrical part; Lamp,switch and socket; Distribution cabinet. |
| Service | Design and production | Construction and test | Validation and training |
| Wall/ceiling panel | Machine-made or Hand-made sandwich board |
| Clean room equipment | Air shower,FFU,Pass box,Laminar flow cabinet,hepa box |
| Cleanliness | Class 100-100000 |
| Purification system | HVAC, or AC conditioner+FFU |
| Floor | PVC anti-static floor or epoxy-based coating |
| Other addessores | stalinite window,LED panel light,Door,Hand wash sink,storage/shoe cabinet etc |
| Service | Design,manufacturing,construction |
Features at a Glance
-
-
Contaminant Prevention & Elimination
Primary mechanism: Controlled dilution and displacement.
Execution: HEPA/ULPA filtration coupled with laminar (unidirectional) or turbulent (mixed) airflow regimes.
Outcome: Continuous removal and suppression of both viable (microbial) and non-viable (particulate) contamination. -
Environmental Process Stabilization
Primary mechanism: Precision regulation of thermodynamic and physical variables.
Execution: Real-time control of temperature, humidity, pressurization, and, when required, vibration and static dissipation.
Outcome: Creation of a predictable, repeatable process foundation, negating ambient environmental drift. -
Spatial Containment & Risk Mitigation
Primary mechanism: Differential energy fields (air pressure gradients) and physical segregation.
Execution: Cascading pressure differentials (positive/negative), sealed construction, and dedicated airlocks.
Outcome: Isolation of critical processes, prevention of cross-contamination, and containment of hazardous materials or pathogens. -
Protocol-Driven Human-Factor Engineering
Primary mechanism: Standardization and proceduralization of all interactions with the controlled environment.
Execution: Comprehensive gowning systems, material decontamination procedures, behavioral training, and defined workflows for personnel, materials, and waste.
Outcome: Mitigation of the single largest contamination vector: human activity. -
Compliance-as-a-Function: Verification & Assurance
Primary mechanism: Data-driven performance validation.
Execution: In-situ particle counting, continuous environmental monitoring (pressure, temp/RH), and rigorous certification against standards (ISO 14644, GMP Annex 1).
Outcome: Objective, documented proof of environmental integrity for regulatory adherence and quality assurance.
-
Project Case – Pharmaceutical Cleanroom Construction Project
Project Overview
| Item | Details |
| Project Type | Pharmaceutical Cleanroom Project |
| Location | Overseas Project |
| Cleanroom Classification | ISO Class 7 / ISO Class 8 |
| Scope of Supply | Cleanroom Panels, HVAC System, AHU Installation, Electrical System, Lighting, Project Management |
| Construction Period | XX Weeks |
| Application | Pharmaceutical Production Area |
Project Background
The client required a GMP-compliant pharmaceutical production facility with controlled temperature, humidity, and air cleanliness levels. SHP was responsible for the cleanroom construction, HVAC system installation, air handling equipment integration, and on-site project management.
The project included cleanroom wall and ceiling systems, air duct installation, AHU deployment, electrical routing, lighting systems, and final commissioning.
Construction Progress
Phase 1 – HVAC Equipment Installation
![]()
![]()
Installation of suspended air handling units (AHUs) and HVAC duct systems above the cleanroom production areas.
Work Completed
- AHU positioning and suspension
- HVAC duct installation
- Airflow distribution planning
- Ceiling service coordination
Engineering Highlights
- Optimized airflow routing
- Reduced pressure loss
- Easy maintenance access
- Compliance with cleanroom airflow requirements
Phase 2 – Cleanroom Wall and Ceiling Framework Installation
![]()