One-Stop Modular Cleanroom Engineering Turnkey Contract Service
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 50 square meters |
| Price: | $500.00/square meters 50-499 square meters |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
clean room engineering service
,turnkey cleanroom contract
,cleanroom construction
One-Stop Modular Cleanroom Engineering Turnkey Contract Service
Product Overview
A standard cleanroom is a controlled enclosed space dedicated to limiting particulate pollution and maintaining constant indoor temperature, humidity and pressure. Adopting advanced purification equipment and sealed structural design, it effectively blocks external dust, bacteria and suspended particles from entering the working area. It has become indispensable infrastructure in pharmaceutical production, electronic precision processing, medical laboratories and cosmetic industries. We deliver one-stop cleanroom turnkey services covering design consultation, scheme optimization, material supply, construction, installation and final acceptance. Each project strictly follows international classification standards and industry compliance regulations. Our professional engineering team ensures reasonable layout, stable purification effect and convenient later maintenance. We commit to providing cost-effective, high-quality cleanroom environments to help clients improve product quality, reduce defective rates and meet industrial production standards.
Project Experience
Pharmaceutical Cleanroom Construction Project
Project Overview
SHP provided a turnkey cleanroom engineering solution for a pharmaceutical manufacturing facility, covering cleanroom partition systems, HVAC air distribution systems, cleanroom ceilings, lighting systems, and on-site installation services.
The project was designed and constructed in accordance with ISO 14644 cleanroom requirements to support controlled production environments and product quality assurance.
Construction Progress & Site Execution
HVAC Ductwork Installation
The HVAC duct system was installed according to the approved airflow design to ensure stable temperature, humidity, pressure differential, and air cleanliness levels within the cleanroom.
Installation of HVAC ductwork and ceiling support systems during cleanroom construction.
![]()
Cleanroom Corridor Completion
The cleanroom corridor section was completed with insulated sandwich panels, cleanroom doors, lighting fixtures, and service openings prepared for final commissioning.
Completed cleanroom corridor with wall panels, lighting system, and service access points.
![]()
Main Cleanroom Area Completion
The cleanroom production area was completed with modular wall panels, ceiling grid systems, and integrated utilities, preparing the facility for equipment installation and validation testing.
Main cleanroom area ready for equipment installation and system validation.
![]()
Scope of Supply
-
Modular Cleanroom Wall Panels
-
Cleanroom Ceiling System
-
HVAC Air Duct System
-
Cleanroom Doors & Windows
-
LED Cleanroom Lighting
-
Installation & Commissioning Support
Project Highlights
✔ Turnkey cleanroom engineering solution
✔ Professional HVAC installation
✔ Modular cleanroom panel construction
✔ ISO 14644 compliant design
✔ Pharmaceutical production environment
✔ Experienced on-site engineering team
Real Project Documentation
The photos shown above were taken during the actual construction process of a pharmaceutical cleanroom project completed by the SHP engineering team. The images demonstrate real installation work, HVAC system integration, cleanroom panel assembly, and project execution capabilities.
AVB Testing Report
Third-Party Performance Testing & Validation
To verify cleanroom performance and environmental control effectiveness, independent testing and validation were conducted after project completion.
Validation Services
- Design Qualification (DQ)
- Installation Qualification (IQ)
- Operational Qualification (OQ)
- Performance Qualification (PQ)
Testing Items
- Airborne Particle Count Test
- Airflow Velocity Test
- Differential Pressure Test
- Temperature Test
- Humidity Test
- Illumination Test
- Noise Test
Third-Party Verification
The cleanroom system was tested and documented by an independent testing organization to verify compliance with project specifications and applicable cleanroom standards.
![]()
Certifications
SHP operates under a certified quality management system and manufactures cleanroom equipment in accordance with international standards for quality, safety and performance. Our engineering and manufacturing processes are continuously audited to ensure compliance with global cleanroom and HVAC project requirements.
Quality Management System
SHP is certified to ISO 9001:2015 Quality Management System standards, covering the design, manufacturing and installation of cleanroom systems, sandwich panels and air purification equipment.
Certificate: ISO 9001:2015 Quality Management System Certification
![]()
CE Certification for Cleanroom Equipment
To support international projects and regulatory compliance, major cleanroom equipment supplied by SHP has been assessed for conformity with applicable European directives related to electrical safety and electromagnetic compatibility.
CE Certified Equipment Includes:
Air Shower Room
Fan Filter Unit (FFU)
Pass Box
CE Certification for Air Shower Room
![]()
CE Certification for Fan Filter Unit (FFU)