Lab Electric Horizontal Air Handler Clean Room Ac DX Type AHU System With R134a Refrigerant
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 1 set |
| Price: | $6,000.00/sets 1-4 sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
Lab clean room ac
,Electric clean room ac
,Horizontal air conditioning for clean room
Lab DX Type Air Handling Unit AHU with R134a Refrigerant
Product Overview
![]()
Modular Air Handling Unit
Key Application Industries
-
-
Semiconductor & Microelectronics: The most stringent requirements for particle, temperature, and humidity control.
-
, Biotechnology & Medical Devices: Requires control of microorganisms (bacteria, viruses) and pressure differentials in addition to particles, complying with GMP regulations.
-
Hospital Operating Rooms, ICUs, Laboratories: Controls infection to ensure medical safety.
-
Precision Optics, Aerospace: Ensures product accuracy and reliability.
-
Food & Cosmetics Manufacturing: Prevents product contamination and extends shelf life.
-
Cleanroom HVAC Applications
| Application | Typical AHU Function |
| Pharmaceutical Cleanrooms | Temperature, humidity and filtered-air supply |
| Medical Device Facilities | Controlled air conditioning and ventilation |
| Electronics Manufacturing | Environmental and particulate-control support |
| Laboratories | Stable temperature and humidity control |
| Cosmetic Manufacturing | Conditioned and filtered air supply |
| Hospitals | HVAC air treatment for controlled areas |
Technical Specifications
| Air Volume | 2000–50000 m³/h |
| Cooling Capacity | 2.0–12.6 kW |
| External Static Pressure | 200–600 Pa |
| Air Filtration | G4 Pre-filter + F8 Medium Filter + H13 HEPA |
| Casing Material | Double-skin Galvanized Steel Sheet (PU Insulated) |
| Coil Material | Copper Tube with Aluminum Fins |
| Fan Type | Centrifugal Plug Fan (EC/AC) |
| Fresh Air Ratio | 20%–30% |
| Power Supply | 380V / 50Hz / 3Ph |
| Refrigerant | R134a |
| Control System | PLC + HMI with BMS Interface |
AHU Configuration & Components
Main AHU Components
- Fresh Air / Return Air Section
Controls the introduction and recirculation of air according to the HVAC design. - Pre-Filtration Section
Removes larger airborne particles before air enters the finer filtration stages. - Cooling Coil
Removes sensible and latent heat from the air. It can be connected to a chilled-water system or other specified cooling source. - Heating Section
Provides heating when required for temperature control or winter operation. - Humidification / Dehumidification
Configured when the cleanroom process requires tighter humidity control. - Fan Section
Provides the required airflow and static pressure for the downstream air distribution system. - HEPA Filtration
Can be incorporated where the system design requires high-efficiency final filtration. - Control Section
Monitors and regulates operating parameters such as temperature, humidity, fan status, and differential pressure.
Airflow & Filtration System
Fresh / Return Air
↓
Pre-Filter
↓
Fine Filter
↓
Cooling / Heating Coil
↓
Fan Section
↓
HEPA Filter*
↓
Cleanroom Air Distribution
HEPA filter location depends on the cleanroom HVAC design. In some systems, final HEPA filtration is installed at the terminal FFU or ceiling level rather than directly inside the AHU
Temperature & Humidity Control
The AHU can be configured to support temperature and humidity control through cooling coils, heating sections, humidification and dehumidification functions. Control parameters are selected according to the cleanroom process, product requirements, outdoor conditions and HVAC design.
- Supply air temperature
- Return air temperature
- Relative humidity
- Cooling coil
- Heating coil
- Humidifier
- Dehumidification
- Sensors
- PLC/HMI
HVAC System Integration
The Clean Room AHU can be integrated with:
- Chilled Water Chiller
- Chilled Water Pumps
- Cooling Towers, where applicable
- Ductwork
- HEPA Filters
- FFUs
- Cleanroom Terminal Units
- Differential Pressure Monitoring
- Temperature & Humidity Sensors
- BMS
The AHU primarily conditions and supplies air, while terminal filtration and airflow distribution are determined by the overall cleanroom HVAC design.
Engineering & Selection Process
Engineering & Selection Process
- 1. Requirement Analysis
Review cleanroom classification, room volume, occupancy, process heat load, outdoor air requirements, temperature and humidity targets. - 2. Airflow Calculation
Determine supply and return airflow based on room requirements, air-change strategy, pressure relationships and process requirements. - 3. AHU Selection
Select airflow capacity, static pressure, cooling/heating capacity, filtration stages, fan type and control configuration. - 4. System Integration
Coordinate AHU with chillers, pumps, ductwork, HEPA filters, FFUs, sensors and BMS. - 5. Manufacturing
Manufacture the AHU according to the approved configuration and technical specifications. - 6. Testing & Commissioning
Perform applicable factory inspection and support on-site commissioning according to the project scope.
Related Cleanroom Project Experience
Pharmaceutical Cleanroom Project – Mauritius
- Application: Pharmaceutical manufacturing
- Scope: HVAC system design / AHU integration / installation support
- Country: Mauritius
Products Description
![]()
A Cleanroom AHU is a technologically intensive, high-precision, high-energy-consumption piece of complex process equipment. It transcends the "comfort" purpose of traditional air conditioning, acting as a critical component of the production process itself. Its design, construction, and operation require interdisciplinary expertise and directly impact final product quality, yield, and operational safety. Selecting and maintaining a qualified Cleanroom AHU is foundational to building a modern cleanroom facility.
Engineering Process
- Requirement Analysis
Review airflow, cooling/heating load, filtration and cleanroom requirements. - AHU Configuration
Select casing, filters, coils, fans and control components according to project specifications. - Manufacturing & Inspection
Assemble and inspect the AHU before shipment. - Installation & Commissioning
Support installation, airflow adjustment and system commissioning. - Testing & Documentation
Provide applicable testing records, operation manuals and project documentation.
Related Products
SHP also provides cleanroom HVAC and environmental control equipment, including:
- Air-Cooled Chillers
- Fan Filter Units (FFUs)
- Cleanroom Air Showers
- Pass Boxes
- Cleanroom Doors and Windows
- HVAC Control Systems
Company Profile
![]()
As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.
As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.
Certifications
Certifications
- ISO 9001:2015
- CE Certificates (if applicable)
- Cleanroom Related Testing Reports
![]()
Customer Photos
![]()
Packing and Shipping
![]()
Why SHP
- 20+ Years of Hands-On Cleanroom Engineering Experience
- Over 2,100 Cleanroom Projects Delivered
- Projects Completed in Over 40 Countries
- Supported by 12 Senior Cleanroom and HVAC Engineers
- Turnkey Capability: Design, Manufacturing, Installation & Commissioning
- Project Support for Pharmaceutical, Electronics, Medical and Laboratory Facilities
FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes. We can provide DQ, IQ, OQ and PQ documentation, FAT/SAT reports, operation manuals, maintenance guides and complete cleanroom drawings according to project requirements.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.