550w Pass Box Air Shower Personal 20 - 25m/S Pass Through Stainless Steel
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 1 set |
| Price: | $2,000.00/sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
550w pass box air shower
,pass box air shower 20m/s
,25m/s stainless steel air shower
AC220V/AC380V Stainless Steel 304 Air Shower Room for Cleanroom Personal Pass Through
Product Overview
Air Shower
Air showers are enclosed chambers installed at cleanroom and controlled environment entry points. Their purpose is to minimize the introduction or egress of airborne particulates. Individuals and items moving through the entrance are thoroughly cleaned by jets of HEPA-filtered air at high velocities of 20-22 m/s (4000-4300 fpm). The contaminated air is subsequently drawn in through the unit's base, filtered, and recirculated back into the system.
![]()
How the Air Shower Works
An air shower acts as part of the personnel purification route and is installed between the gowning area and the controlled cleanroom area.
- 1. Personnel Entry
Staff proceed into the air shower from the gowning or lower-cleanliness side. - 2. Door Interlocking
An interlocking system directs the entrance and exit doors, helping to prevent simultaneous opening during normal operation. - 3. Air Shower Cycle
Filtered air is channeled through directional nozzles, removing loose particles from exposed surfaces of cleanroom garments. - 4. Air Recirculation and Filtration
According to how the equipment is configured, the air circulation system recovers air and passes it through the filtration system. - 5. Cleanroom Entry
On completion of the programmed shower cycle, the exit door can be released and personnel proceed into the controlled area.
The actual shower cycle, airflow configuration, filtration arrangement and control logic should be selected consistent with the cleanroom design and project requirements.
Advantages of a Cleanroom Air Shower
-
Effective Personnel & Material Decontamination
-
Superior Contamination Control & Isolation
-
Process Standardization & Personnel Discipline
-
Testing & Validation
- Visual scrutiny of the unit
- Measurement and dimension check
- Testing door operation
- Interlock function verification
- Fan running and operation check
- Lighting and illumination test
- Control panel functional verification
- Airflow measurement check
- HEPA filter integrity check as required
Manufacturing Capability
Based in Suzhou, China, SHP was established in 2003 as a cleanroom engineering and manufacturing company.
Drawing on over 20 years of cleanroom engineering experience and a 10,000+ m² workshop, SHP manufactures and integrates cleanroom equipment including Air Shower Rooms, FFUs, Pass Boxes, HEPA Boxes, Clean Benches, Cleanroom Doors and HVAC systems.
The production of Air Shower units encompasses enclosure fabrication, fan and filtration assembly, door and interlock installation, electrical control integration, and pre-shipment inspection per the approved project configuration.
Our Certification

Operational Economy & Sustainability
-
Versatile Application & Adaptability
Main Components & Construction
| Component | Function |
| Air Shower Chamber | Enclosed unit for personnel purification |
| HEPA Filter | High-standard air filtration |
| Fan / Blower | Creates the circulating airstream |
| Air Nozzles | Drives filtered air at personnel |
| Interlocked Doors | Supervises entry and exit |
| Control Panel | Controls the shower cycle and the door mechanism |
| Lighting | Supplies lighting within the chamber |
| Ceiling / Wall Panels | Creates an enclosure that is easy to clean |
| Floor | Supports personnel while facilitating cleaning |
| Emergency Release | Delivers emergency release for the door where configured |
Technical Specifications
| Product Type | Personnel Air Shower |
| Application | Cleanroom Personnel Entry |
| Construction | Stainless Steel 304 |
| Door Type | Single / Double Door |
| Door Interlock | Mechanical / Electronic |
| Filtration | Pre-filter + HEPA filter |
| Control | Automatic / PLC-based |
| Lighting | LED |
| Air Nozzles | Adjustable |
| Shower Cycle | Project-specific |
| Power Supply | AC220V / AC380V |
| Working Dimensions | Customized |
| Overall Dimensions | Customized |
| Number of Persons | Single / Multiple |
| Installation | Indoor / Cleanroom Entrance |
| Surface Finish | Project-specific |
Main Specification for Air Shower
| ITEM NO. | PERSONNEL AIR SHOWER | CARGO AIR SHOWER | ||
| SHP01 | SHP02 | SHP03 | SHP04 | |
| EXTERNAL SIZE(W×D×H) mm | 1300×1000×2050 | 1500×1000×2050 | 1500×2000×2050 | 2200×2000×2050 |
| INTERNAL SIZE(W×D×H) mm | 800×920×1895 | 800×920×1895 | 800×1920×1895 | 1500×1920×1980 |
| PERSONS PER CYCLE | one person | one person | two person | N/A |
| BLOWING WAY | one side blowing | two sides blowing | two sides blowing | two sides blowing |
| BLOWER POWER | 550w × 1set | 550w × 2set | 550w × 4set | 750w × 2set |
| NO. OF NOZZLES | 6 pcs | 12 pcs | 24 pcs | 24 pcs |
| LED LIGHTS | 20w × 1pcs | 20w × 1pcs | 20w × 2pcs | 20w × 1pcs |
| PRIMARY AIR FILTER | G3,G4 | |||
| HEPA FILTER EFFICIENCY | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) |
| SIZE OF HEPA FILTER | 700×610×100 1pcs | 700×610×100 2pcs | 700×610×100 4pcs | 700×610×100 4pcs |
| SPRAYING WIND SPEED | 20-25m/s | |||
| SHOWER TIME | 0-99s adjustable | |||
Air Shower Types & Configurations
| Type | Typical Application |
| Single-Person Air Shower | Entrance for personnel at small cleanrooms |
| Multi-Person Air Shower | Improved throughput of personnel |
| Tunnel Air Shower | Larger personnel passage |
| Stainless Steel Air Shower | Pharmaceutical, medical and hygiene-conscious environments |
| Coated Steel Air Shower | Common cleanroom uses |
| Portable Air Shower | Temporary and mobile cleanroom applications |
| Customized Air Shower | Layouts and dimensions specific to project requirements |
Products Description
![]()
- Slide rail style door closer:A slide rail door closer for air showers is a high-durability, high-precision core functional component designed to safeguard cleanroom environments.
- LCD control screen:The LCD control panel is not only the "intelligent brain" of the air shower but also a critical component that enhances equipment reliability, operational efficiency, and management standards.
- Stainless steel nozzle:For cleanrooms with high standards, high-frequency usage, and stringent certification requirements (such as those in , biotechnology, microelectronics, precision instruments, etc.), stainless steel nozzles are an essential and wise choice. They offer exceptionally long service life, nearly zero maintenance costs, and irreplaceable reliability.
- High efficiency filter:The HEPA filter is the "lungs" of the air shower, directly determining the quality of the blown air. Its ultra-high filtration efficiency, stable performance, and compliance are non-negotiable advantages.
Related Products
Packing and Shipping
![]()
Why Choose SHP
| Capability | Evidence |
| Cleanroom Experience | Established in 2003 |
| Engineering Experience | 20+ years |
| Manufacturing | 10,000+ m² workshop |
| Cleanroom Projects | 2,100+ completed projects |
| Global Experience | Projects in 40+ countries |
| Engineering Team | 12 senior cleanroom/HVAC engineers |
| Product Range | Air Shower, FFU, Pass Box, AHU, Cleanroom Systems |
| Project Service | Design → Manufacturing → Installation → Commissioning |
FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.