Clean Work Air Shower Clean Room Booth 2.2KW CE With Sole Cleaning Machine
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 1 set |
| Price: | $2,000.00/sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
Clean Work air shower
,air shower clean room 2.2KW
,air shower booth CE
Product Overview ——Clean Work Rooms Made Simple CE Certified Air Shower Room with Sole Cleaning Machine
![]()
Air Shower
Installed at the entry points of cleanrooms and similar controlled spaces, air showers are enclosed chambers designed to prevent the transfer of airborne particulates. Upon entry, personnel and materials undergo a decontamination process using high-velocity jets of HEPA-filtered air, with velocities ranging from 20-22 m/s (4000-4300 fpm). The dislodged contaminated air is then directed downward, captured through the unit's base, filtered, and recirculated.
Main Specification for Air Shower
| ITEM NO. | PERSONNEL AIR SHOWER | CARGO AIR SHOWER | ||
| SHP01 | SHP02 | SHP03 | SHP04 | |
| EXTERNAL SIZE(W×D×H) mm | 1300×1000×2050 | 1500×1000×2050 | 1500×2000×2050 | 2200×2000×2050 |
| INTERNAL SIZE(W×D×H) mm | 800×920×1895 | 800×920×1895 | 800×1920×1895 | 1500×1920×1980 |
| PERSONS PER CYCLE | one person | one person | two person | N/A |
| BLOWING WAY | one side blowing | two sides blowing | two sides blowing | two sides blowing |
| BLOWER POWER | 550w × 1set | 550w × 2set | 550w × 4set | 750w × 2set |
| NO. OF NOZZLES | 6 pcs | 12 pcs | 24 pcs | 24 pcs |
| LED LIGHTS | 20w × 1pcs | 20w × 1pcs | 20w × 2pcs | 20w × 1pcs |
| PRIMARY AIR FILTER | G3,G4 | |||
| HEPA FILTER EFFICIENCY | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) |
| SIZE OF HEPA FILTER | 700×610×100 1pcs | 700×610×100 2pcs | 700×610×100 4pcs | 700×610×100 4pcs |
| SPRAYING WIND SPEED | 20-25m/s | |||
| SHOWER TIME | 0-99s adjustable | |||
Key Components&Design Features
-
-
Enclosure: Constructed from smooth, non-shedding materials like powder-coated steel or stainless steel (for pharmaceutical or corrosive environments).
-
Filtration System:
-
HEPA Filter: The core component, with minimum efficiency of 99.97% on 0.3-micron particles.
-
Pre-Filter: Extends HEPA filter life by capturing bulk particulates.
-
-
Airflow System: Centrifugal blower fans ensure consistent, high-volume airflow.
-
Nozzle Array: Adjustable stainless steel nozzles for uniform full-body coverage.
-
Control System: Microprocessor-based panel for setting cycle time (10-120 seconds), fan speed, and monitoring filter status.
-
Interlocking Doors: Critical for maintaining pressure differentials and preventing cross-contamination.
-
Safety Features: Emergency stop buttons, interior door release mechanisms, and viewing windows.
-
Products Description
![]()
- Slide rail style door closer:A slide rail door closer for air showers is a high-durability, high-precision core functional component designed to safeguard cleanroom environments.
- LCD control screen:The LCD control panel is not only the "intelligent brain" of the air shower but also a critical component that enhances equipment reliability, operational efficiency, and management standards.
- Stainless steel nozzle:For cleanrooms with high standards, high-frequency usage, and stringent certification requirements (such as those in , biotechnology, microelectronics, precision instruments, etc.), stainless steel nozzles are an essential and wise choice. They offer exceptionally long service life, nearly zero maintenance costs, and irreplaceable reliability.
- High efficiency filter:The HEPA filter is the "lungs" of the air shower, directly determining the quality of the blown air. Its ultra-high filtration efficiency, stable performance, and compliance are non-negotiable advantages.
Related Products
Our Certification
![]()
Packing and Shipping
![]()
FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.