Adjustable Shower Time Air Shower Room Personnel Decontamination With 99.995% Hepa Filter
| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 1 set |
| Price: | $2,000.00/sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
99.995% Hepa Filter Air Shower Room
,Personnel Decontamination Air Shower Room
,Adjustable Shower Time Air Shower
Adjustable Shower Time Personnel Decontamination Air Shower with 99.995% HEPA Filter
Product Overview
Simply put, an Air Shower is like the "dust-removal security gate" for a cleanroom. Anyone or any material entering the cleanroom must pass through this checkpoint first — it blows out high-speed purified air to remove dust, hair, and other contaminants attached to people’s clothes and material surfaces. Meanwhile, its two doors cannot be opened at the same time, which prevents unfiltered dirty air from directly getting into the cleanroom. With an air shower in place, the clean environment inside the cleanroom can be maintained consistently to meet the requirements of production and experiments.
![]()
How the Air Shower Works
As a rule, an air shower is installed between the gowning area and the controlled cleanroom area as part of the personnel purification route.
- 1. Personnel Entry
Personnel pass into the air shower from the gowning or lower-cleanliness side. - 2. Door Interlocking
To help prevent both doors from opening at once during normal operation, the entrance and exit doors are controlled by an interlocking system. - 3. Air Shower Cycle
Filtered air passes through directional nozzles to dislodge loose particles from exposed surfaces of cleanroom garments. - 4. Air Recirculation and Filtration
Air is recovered by the circulation system and passed through the filtration system according to the equipment configuration. - 5. Cleanroom Entry
Following the programmed shower cycle, the exit door can be released and personnel move into the controlled area.
The actual shower cycle, airflow configuration, filtration arrangement and control logic ought to be selected according to the cleanroom design and project requirements.
Features at a Glance
- 360° Surface Dust Removal
- Air Curtain Barrier for Contamination Isolation
- Mandatory Purification Control
- Intelligent and Automated Operation
- Data Traceability and System Linkage
- Scenario-adaptive Purification
Main Components & Construction
| Component | Function |
| Air Shower Chamber | Enclosed zone dedicated to personnel purification |
| HEPA Filter | Efficient filtration of airborne particles |
| Fan / Blower | Provides circulating airflow |
| Air Nozzles | Guides filtered air onto personnel |
| Interlocked Doors | Directs entry and exit |
| Control Panel | Controls the shower cycle and door action |
| Lighting | Gives internal illumination |
| Ceiling / Wall Panels | Provides the cleanable enclosure |
| Floor | Carries personnel and facilitates cleaning |
| Emergency Release | Enables emergency door release where configured |
Technical Specifications
| Product Type | Personnel Air Shower |
| Application | Cleanroom Personnel Entry |
| Construction | Stainless Steel / Coated Steel |
| Door Type | Single / Double Door |
| Door Interlock | Mechanical / Electronic |
| Filtration | Pre-filter + HEPA filter |
| Control | Automatic / PLC-based |
| Lighting | LED |
| Air Nozzles | Adjustable |
| Shower Cycle | Adjustable |
| Power Supply | Project-specific |
| Working Dimensions | Customized |
| Overall Dimensions | Customized |
| Number of Persons | Single / Multiple |
| Installation | Indoor / Cleanroom Entrance |
| Surface Finish | Project-specific |
Main Specification for Air Shower
| ITEM NO. | PERSONNEL AIR SHOWER | CARGO AIR SHOWER | ||
| SHP01 | SHP02 | SHP03 | SHP04 | |
| EXTERNAL SIZE(W×D×H) mm | 1300×1000×2050 | 1500×1000×2050 | 1500×2000×2050 | 2200×2000×2050 |
| INTERNAL SIZE(W×D×H) mm | 800×920×1895 | 800×920×1895 | 800×1920×1895 | 1500×1920×1980 |
| PERSONS PER CYCLE | one person | one person | two person | N/A |
| BLOWING WAY | one side blowing | two sides blowing | two sides blowing | two sides blowing |
| BLOWER POWER | 550w × 1set | 550w × 2set | 550w × 4set | 750w × 2set |
| NO. OF NOZZLES | 6 pcs | 12 pcs | 24 pcs | 24 pcs |
| LED LIGHTS | 20w × 1pcs | 20w × 1pcs | 20w × 2pcs | 20w × 1pcs |
| PRIMARY AIR FILTER | G3,G4 | |||
| HEPA FILTER EFFICIENCY | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) | H14(99.99%@0.3μm) |
| SIZE OF HEPA FILTER | 700×610×100 1pcs | 700×610×100 2pcs | 700×610×100 4pcs | 700×610×100 4pcs |
| SPRAYING WIND SPEED | 20-25m/s | |||
| SHOWER TIME | 0-99s adjustable | |||
Air Shower Types & Configurations
| Type | Typical Application |
| Single-Person Air Shower | Entry point for personnel in compact cleanrooms |
| Multi-Person Air Shower | Improved personnel throughput |
| Tunnel Air Shower | Larger volume of personnel traffic |
| Stainless Steel Air Shower | Hygiene-sensitive settings including pharmaceutical and medical |
| Coated Steel Air Shower | General cleanroom uses |
| Portable Air Shower | Flexible or temporary cleanroom uses |
| Customized Air Shower | Project-tailored layouts and dimensions |
Cleanroom Applications
As a rule, air shower rooms are integrated into the personnel purification route between gowning areas and controlled cleanroom spaces.
Applications commonly include:
- Pharmaceutical sector
- Medical and healthcare settings
- Laboratory spaces
- Electronics manufacturing and semiconductors
- Beverage and food production
- Cosmetics and personal care production
- Precision parts manufacturing
Together with the cleanroom layout, personnel flow, cleanliness requirements and operating procedures, the air shower configuration should be selected rather than treated as an isolated equipment component.
Engineering & Customization Process
- 1. Requirement Analysis
Go over the cleanroom classification, personnel flow, available installation space and operating requirements. - 2. Configuration Design
Define the air shower type, dimensions, door arrangement, filtration and control configuration according to the project. - 3. Manufacturing
Fabricate and fit the chamber, filtration system, fan section, doors and control components according to the approved configuration. - 4. Factory Inspection
Before shipment, inspect the assembled unit, electrical system, door operation, interlock function and other applicable items. - 5. Installation & Commissioning
Provide support for site installation, connection and functional commissioning according to project requirements. - 6. Documentation
Deliver applicable product drawings, operation instructions, maintenance information and testing records.
Testing & Validation
- Visual assessment
- Measurement check
- Door operation check
- Interlock test
- Fan operation check
- Lighting check
- Control panel operation test
- Airflow confirmation
- HEPA filter integrity testing where applicable
Company Profile
![]()
As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.
As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.
Customer Photos
![]()
Our Certification
![]()
Products Description
![]()
- Slide rail style door closer:A slide rail door closer for air showers is a high-durability, high-precision core functional component designed to safeguard cleanroom environments.
- LCD control screen:The LCD control panel is not only the "intelligent brain" of the air shower but also a critical component that enhances equipment reliability, operational efficiency, and management standards.
- Stainless steel nozzle:For cleanrooms with high standards, high-frequency usage, and stringent certification requirements (such as those in , biotechnology, microelectronics, precision instruments, etc.), stainless steel nozzles are an essential and wise choice. They offer exceptionally long service life, nearly zero maintenance costs, and irreplaceable reliability.
- High efficiency filter:The HEPA filter is the "lungs" of the air shower, directly determining the quality of the blown air. Its ultra-high filtration efficiency, stable performance, and compliance are non-negotiable advantages.
Related Products
Our Customers
![]()
Why Choose SHP
| Capability | Evidence |
| Cleanroom Experience | Established in 2003 |
| Engineering Experience | 20+ years |
| Manufacturing | 10,000+ m² workshop |
| Cleanroom Projects | 2,100+ completed projects |
| Global Experience | Projects in 40+ countries |
| Engineering Team | 12 senior cleanroom/HVAC engineers |
| Product Range | Air Shower, FFU, Pass Box, AHU, Cleanroom Systems |
| Project Service | Design → Manufacturing → Installation → Commissioning |
FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.