| Brand Name: | SHP |
| MOQ: | 1 set |
| Price: | $8,000.00/sets 1-4 sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
![]()
Chiller
A chiller is the "heart of the cooling source" for central air conditioning and industrial refrigeration systems. It consumes electrical or thermal energy to cool ordinary water into low-temperature chilled water, which is then pumped like "blood" to every corner of a building or to production equipment, enabling large‑scale, high‑efficiency cooling.
Cleanrooms typically require multiple, independent water systems with precise temperature control.
| System Name | Typical Supply Temp. | Primary Purpose | Critical Requirements |
| Process Cooling Water(PCW) | Medium Temp:~12℃ - 15℃ | Cools process equipment directly (ethtools,implanters,reactors) | Extreme stability:Temp.fluctuation≤±0.5℃ to ±0.1℃.Highest reliability. |
| Ultrapure Water (UPW) Chilling | Low Temp:~7℃ - 9℃ | Cools UPW polishing loops to maintain water resistivity. | High-purity materials (SUS 316L,PVDF) to prevent ionic contamination. |
| Low-Temperature Glycol Water | Chilled Fluid:~4℃ - 6℃ | Cools special process tools or controls dewpoint in dry processes. | Glycol-water mixture to prevent freezing.Precise temperature control. |
| Reheat Hot Water | High Temp:~18℃ - 21℃ | Supplies reheat coils in AHUs for precision humidity control (dehumidify & reheat). | Stable supply temperature for consistent space conditions. |
Note:A single chiller may serve one loop,or dual-temperature chillers may supply both chilled and reheat water simultaneously.
Heat Absorption Side (Evaporator): Absorbs heat from inside the building or from industrial processes, cooling the target.
Heat Rejection Side (Condenser): Discharges the absorbed heat, along with the heat generated by the compressor's work, to the external atmosphere (via a cooling tower or fans).
This achieves the continuous transfer of unwanted internal heat to the external environment.
Advanced chillers are equipped with sophisticated control systems that:
Automatically modulate cooling capacity output (e.g., via variable-speed compressors, inlet guide vanes) in response to changes in the end-user load.
Maintain a stable supply (chilled water) temperature within a set range, which is critical for both process cooling (e.g., pharmaceuticals, precision manufacturing) and comfort air conditioning.
Multi-Unit Coordination: Multiple chillers can operate in parallel, with intelligent sequencing and load sharing to achieve optimal efficiency.
System-Wide Integration: They communicate and coordinate with cooling towers, pumps, and terminal units for optimized system control (e.g., raising the condenser temperature setpoint for energy savings at part load).
Data Monitoring & Diagnostics: They provide real-time monitoring of operating parameters, fault alerts, and data for predictive maintenance and efficiency analysis.
![]()
As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.
As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.
![]()
![]()
![]()
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.