380V - 415V Clean Room Hvac Control Water Chiller Unit Air Air Cooled Chiller
| Brand Name: | SHP |
| MOQ: | 1 set |
| Price: | $8,000.00/sets 1-4 sets |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
380V Clean Room Hvac Control
,415V Clean Room Hvac Control
,Clean Room Hvac Control Chiller
380-415V 3N-50Hz Inverter Technology Industrial Air Cooled Chiller for Refrigeration
Product Overview
Chiller
In cleanroom engineering projects, a chiller is a core industrial refrigeration device. It cools water or other secondary refrigerants to a preset temperature (typically 7–12℃) via vapor compression or absorption refrigeration cycle. The chilled fluid is then delivered through a closed pipeline system to air conditioning terminals inside the cleanroom (e.g., FFU, dry coil, constant temperature and humidity unit). As a stable cold source, it enables precise control of indoor temperature, humidity and dew point, ensuring the stability of the clean environment and process reliability.
![]()
Features at a Glance
- Maintain a constant temperature and humidity environment in the cleanroom to meet the stringent requirements of ISO cleanroom classification and process production for temperature and humidity (e.g., electronic chip workshops, biopharmaceutical cleanrooms);
- Provide process cooling for process equipment (e.g., lithography machines, fermentation tanks) to prevent equipment overheating from affecting precision or product quality;
- Cooperate with the HVAC system to achieve heat balance, reduce cleanroom energy consumption and improve system operation efficiency.
Typical Applications
- Pharmaceutical Cleanrooms
Designed for HVAC systems requiring GMP compliance. - Electronics Manufacturing
Creates stable conditions for electronic production. - Medical Device Production
Ensures processing environments remain controlled. - Laboratory Facilities
Works with temperature-sensitive research programs. - Cosmetic Production Areas
Installed in controlled manufacturing workshops.
Technical Specifications
| Cooling Capacity | 30–260 kW |
| Chilled Water Temperature | 4°C–15°C |
| Control Accuracy | ±0.5°C |
| Refrigerant | R410A |
| Compressor Type | Scroll (Inverter) |
| Power Supply | 380–415V 3N-50Hz |
| Noise Level | ≤72 dB |
| Control System | PLC + HMI |
| Communication | Modbus / BMS |
Main Specification for Chiller
Cleanrooms typically require multiple, independent water systems with precise temperature control.
| System Name | Typical Supply Temp. | Primary Purpose | Critical Requirements |
| Process Cooling Water(PCW) | Medium Temp:~12℃ - 15℃ | Cools process equipment directly (ethtools,implanters,reactors) | Extreme stability:Temp.fluctuation≤±0.5℃ to ±0.1℃.Highest reliability. |
| Ultrapure Water (UPW) Chilling | Low Temp:~7℃ - 9℃ | Cools UPW polishing loops to maintain water resistivity. | High-purity materials (SUS 316L,PVDF) to prevent ionic contamination. |
| Low-Temperature Glycol Water | Chilled Fluid:~4℃ - 6℃ | Cools special process tools or controls dewpoint in dry processes. | Glycol-water mixture to prevent freezing.Precise temperature control. |
| Reheat Hot Water | High Temp:~18℃ - 21℃ | Supplies reheat coils in AHUs for precision humidity control (dehumidify & reheat). | Stable supply temperature for consistent space conditions. |
Note:A single chiller may serve one loop,or dual-temperature chillers may supply both chilled and reheat water simultaneously.
HVAC System Integration
The unit supports being integrated with:
- Air Handling Units (AHU)
- Fan Filter Units (FFU)
- Ducting Systems
- Air Distribution Networks
- Building Management Systems (BMS)
- Temperature and Humidity Control Systems
This integration helps provide a stable environmental control system for cleanroom facilities.
Engineering Process
SHP accompanies the project lifecycle with ongoing engineering support:
- Requirement Analysis
Examine cooling load and cleanroom requirements. - System Design
Work out HVAC cooling solutions based on project specifications. - Equipment Manufacturing
Fabricate and inspect equipment before shipment. - Installation Support
Assist with installation and commissioning at the project site. - Performance Verification
Help verify system testing and operation.
Related Cleanroom Projects
Relevant Project Track Record
Pharmaceutical Cleanroom Project – Mauritius
Scope: HVAC system design, chilled water system integration and installation assistance.
Electronics Manufacturing Cleanroom
Scope: Cooling system design, AHU integration and environmental control backup.
Validation & Testing
System Testing & Checks
Before delivery, equipment may be evaluated through:
- Functional Testing
- Cooling Capacity Verification
- Electrical Safety Inspection
- Control System Testing
- Factory Acceptance Testing (FAT)
The testing procedures may be adapted to project requirements.
Certifications
Certifications
- ISO 9001:2015
- CE Certificates (if applicable)
- Cleanroom Related Testing Reports
![]()
Company Profile
![]()
Suzhou Huajing Air-Condition Purification Engineering Installation Co., Ltd. (SHP) provides cleanroom engineering, HVAC and environmental-control solutions for pharmaceutical, electronics, medical, laboratory and other controlled manufacturing facilities. The company was established in 2003 and provides design, manufacturing, installation, commissioning and validation support for cleanroom projects.
SHP reports more than 20 years of cleanroom engineering experience, 2,100+ completed projects and project delivery experience in more than 40 countries.
Why SHP
- 20+ Years of Cleanroom Engineering Capability
- 2,100+ Cleanroom Projects Accomplished
- Global Delivery to 40+ Countries
- All-in-One Design, Manufacturing, Installation and Validation
- Designed for Pharmaceutical, Electronics, Laboratory and Medical Device Facilities
FAQ
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes. We can provide DQ, IQ, OQ and PQ documentation, FAT/SAT reports, operation manuals, maintenance guides and complete cleanroom drawings according to project requirements.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.