| Brand Name: | SHP |
| Model Number: | Customized |
| MOQ: | 50 square meters |
| Price: | $500.00/square meters 50-499 square meters |
| Payment Terms: | L/C,T/T |
| Supply Ability: | ≥1 set |
![]()
The definition of a cleanroom is a room in which the number of airborne particles is kept to a minimum using artificial means.These rooms are used in the semiconductor and chip industry,in the pharmaceutical and food industry,and also in electronic device manufacturing.The small particles in the ambient air that pose no danger to humans can still damage,contaminate or even destroy products from the aforementioned industries.
| Application | Pharmaceutical | Lab | Electronics |
| Cleanliness | China class 100 to 100000 | ISO 5 to 8 | EU B to D |
| Scope |
Structure part; Partition and ceiling panel; door and window,epoxy. |
HVAC part; AHU and chiller; Ducting and piping. |
Electrical part; Lamp,switch and socket; Distribution cabinet. |
| Service | Design and production | Construction and test | Validation and training |
| Wall/ceiling panel | Machine-made or Hand-made sandwich board |
| Clean room equipment | Air shower,FFU,Pass box,Laminar flow cabinet,hepa box |
| Cleanliness | Class 100-100000 |
| Purification system | HVAC, or AC conditioner+FFU |
| Floor | PVC anti-static floor or epoxy-based coating |
| Other addessores | stalinite window,LED panel light,Door,Hand wash sink,storage/shoe cabinet etc |
| Service | Design,manufacturing,construction |
Primary Advantage: Eliminates contamination from airborne particles (dust, microbes, aerosols), preventing product defects, short circuits, or infections. A single microscopic particle can ruin an entire silicon wafer or a batch of pharmaceuticals.
Strict control over temperature, humidity, pressure, and airflow patterns (e.g., laminar flow). This ensures process stability and reproducibility, minimizing product variability caused by environmental fluctuations.
Essential for meeting stringent international standards such as ISO 14644 and GMP (Good Manufacturing Practice), which are mandatory for product approval and market entry.
Dramatically reduces the risk of catastrophic costs associated with product recalls, contamination events, and legal liabilities.
Protection for Personnel and Materials
In biosafety labs (e.g., BSL-3/4), containment cleanrooms prevent the escape of hazardous pathogens, protecting researchers and the public.
Safeguards sensitive research samples and reagents from environmental degradation.
Although the initial capital investment is high, the significant increase in product yield, reduction in scrap, and avoidance of contamination failures lead to a very high return on investment over time.
![]()
![]()
![]()
![]()
![]()
![]()
As a leading supplier of clean room system and clean room products,SHP is an organization that prides itself both on technical expertise as well as next level customer care.SHP offers Cleanroom Solutions to meet our clients' particular requirements specialized for pharmaceutical,biotechnology and microelectronic cleanrooms.We also provide a range of Clean Room products including wall panel,door&window and a series of clean room equipment.
As an ISO 9001:2015 certified organization,we are committed to continually improving our customer service programs while meeting or exceeding your product quality criteria.With our comprehensive customer solution offerings,excellence in products,and decades of technical expertise,we are confident that SHP can match the best to your application.
![]()
![]()
![]()
![]()
Q1: Where is your company?
A1:Our company is located in Suzhou City, close to Shanghai. It's a 1.5-hour drive from PVG Airport.
Q2: Are you a manufacturer or a trading company? What can I buy from you?
A2: We are manufacturers. We focus on cleanroom projects, air showers, FFUs, through boxes, dosing rooms, laminar flow hoods and benches, AHUs, and sealed doors and Windows.
Q3:When is your delivery time?
A3: If your cleanroom project includes AHU, the delivery time is 35 days. If you purchase goods without an AHU, the delivery time is 10 days.
Q4: How long is your warranty period? What kind of after-sales service can you offer?
A4: Our warranty period is two years after the completion of the project. During the warranty period, if there are any problems, we will replace it. If you can't handle it, we will send an engineer to solve it for free.
Q5:Can you conduct cleanroom validation?
A5: Yes, we can offer documentaries of DQ, IQ, OQ and PQ. Still fat & Sitting. Product operation manual, maintenance guide and a complete set of cleanroom drawings.
Q6:What are your advantages?
A6: We have a complete technical team consisting of 12 senior cleanroom and HVAC engineers to provide you with technical support. We have completed over 2,100 cleanroom projects in China and overseas. Such as Japan, Indonesia, Thailand, Bangladesh, India, North Macedonia, Saudi Arabia, Yemen, Russia, Moldova, Switzerland, Norway, the United Kingdom, Spain, France, Belgium, Kuwait, Tunisia, Mauritius, Sri Lanka, Mongolia, Philippines, Nepal, Sudan, Somaliland, Australia, New Zealand, Canada, Algeria, Egypt, Singapore, and the United States.